bridges
2021
One Madison Sky Bridge
![One Madison Bridge.png](https://static.wixstatic.com/media/6e829c_cf4ca1fe1324456abc139ea4e8fd7e3e~mv2.png/v1/fill/w_456,h_349,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/One%20Madison%20Bridge.png)
The historic sky bridge connected the buildings located at One Madison and 11 Madison Ave. Located 12 stories up in the air, the project required significant logistical coordination. Extensive pre-planning was required to obtain road closures, crane permits, and engineering plans.
The structure was stripped and craned down in large sections. The work was completed in a tight time-frame over 2 weekends.
2019
Squibb Park Bridge
Completed over a single weekend, the dismantle and removal of the Squibb Park Bridge was a challenging project.
​
Extensive planning by the Titan Team ensured that the dismantle, including significant crane work, was successfully completed within the required time frame and to the praise of the client.